Don't miss job vacancy. Get Daily Job Alerts by Email:

Enter email address above.

Monday, February 3, 2014

Global Energy Consulting Engineers

Global Energy Consulting Engineers

6-3-570/1, Diamond Block, Rockdale, Compound, Somajiguda,
Hyderabad, Andhra Pradesh-500082
Phone:30683332, 30683333,Fax: 23328917
Email: gece@geceindia.com
Website: www.geceindia.com

Company Head

Mr. M V Krishna Rao
Director

Contact

Mr. B S Varma
Director

Employees
Software:50;

Year Establishment 1995

Company Profile

Global Energy Consulting Engineers is an organization dedicated to providing World Class Consultancy Services and Information Technology Solutions for the Energy Sector. GECE is an ISO 9001:2000 certified company in “ Design and Development of Software Products and Services, and Consultancy Services in the field of Energy, Global Positioning Systems (GPS), Geographic Information System (GIS), Customer Relationship Management (CRM) and Project Management.” POWERGISTM, an advanced and powerful application designed and developed for building GIS (Geographic Information Systems) is the first Indian product to receive the OpenGIS Certificate as compliant with OpenGIS simple features for SQL, Revision 1.1.  The product is listed on the official website of Open GIS Consortium and can be viewed at the following URL.http://www.opengis.org/resources/?page=products&view=listbyorg&ctid=260&conf=2

A comprehensive range of consultancy services tailored to specific requirements addressing a broad spectrum of activities in utility mangement.  With an exemplary track record of successfully executing numerous prestigious consultancy assignments to our credit, we are reckoned with as a leading solutions and services provider in the Indian power sector.

We offer IT solutions for the utility sector integrating seamlessly technical and business appliations encompassing every activity of Power Utility Management.Our IT solutions Power Workstations are based on Centralized database architecture and are also Open Systems compliant.

We are the pioneers in introduction of GPS technology for utility mapping in India.Simultaneous building up of the Network, Asset/Facilities and Customer Databases is the unique competitive advantage of partnering with us.Custom built software to generate at the click of a button, digital output of GPS survey data.Technically qualified and capable people determine the success of these projects and we are a strong force to be reckoned with.

Our training division known as Power Technology Training and Education Center  (POWERTECTM), is the unique institution in India, which provides hands on training to utility engineers on deployment

Vertical Segment


•    Utilities
•    Power & Energy
•    Transportation

Business Continuity


GECE’s business continuity plan is designed keeping in view the safety of infrastructure, processes, data and personnel in the organization. It ensures the recovery of the organizations’ resources and operations in case it is confronted with adverse events such as technological failure, natural disasters, human fault or any nature of destruction intentionally or unintentionally

IT Products


•    POWERAMR
•    POWERDESIGN
•    POWERPROJECT
•    POWEROUTAGE
•    POWERDESPATCHER
•    POWERCRM
•    POWERTCM
•    POWERTRANS
•    POWERAUDIT
•    POWERGIS
•    POWERCUSTOMER
•    POWERMBC
•    POWERASSET
•    POWERDA
•    POWERNET

IT Services

•    ERP Solutions & services
•    Custom Application/Development and Maintenance
•    QA & Testing services
•    CRM Solutions & Services
•    Engineering Services
•    IT Training and Education
•    Systems Integrators
•    Network Management Solution & Services
•    Technology services
•    Packaged S/W installation & Support
•    IT Consulting

IT & Telecom Infrastructure

GECE implements state of the art technology in its internal IT and Telecom infrastructure. It is equipped with higher end server connected to 90 state-of-art computing systems on Unix and windows platforms for conducting studies & software development and advanced office automation systems for support and processing information. We have one A3 printer, copier, scanner cum fax and also one A0 size plotter, copier cum scanner. We have a Trimble GPS base station with 16 rovers for carrying out GPS survey. GECE also implements a state of the art EPABX system with 100 lines. Internet connectivity is achieved through Two

IT Enabled Services


•    Network Management
•    Financial Analysis
•    Billing Services
•    Asset Management
•    Engineering & Design Services
•    Digitization (including GIS)

IT Projects


•    Vadodara City GIS Project - The work contemplated under this consultancy assignment are:
•    * Conduct a line survey of the entire distribution network in Baroda City using differential GPS
•    * Collect line data like length of 11kV and LV lines, number of distribution transformers capacity wise, etc.
•    * Assign a unique number to each pole while conducting the survey.
•    * Creation of network maps
•    * Collect Survey of India maps /
•    Delhi Vidyut Board Model Distribution Project - The consultancy assignment is to develop Model Distribution Management for Nehru Place Area, Delhi Vidyut Board covering all facets of the Power Utility with the objective to replicate it in other areas of the utility. The important activities envisaged are:
•   
•    §    To account for every unit of electricity fed in the Distribution System
•    §    To workout solutions to reduce line losses in the Distributio
•    Integrated System Improvement Project of Kerala State - The consultancy assignment was successfully completed for Kerala State Electricity Board on Formulation of Integrated System Improvement Projects for 11 Districts of Kerala State. The important features of the consultancy assignment are
•    ¨    Digitisation of district maps.
•    ¨    Study and Analysis of Transmission, and Distribution System in these districts.
•    ¨    Long term 132 kV Transmission System Expa
•    Distribution Automation Project - Integration of GECE power workstations with with SPIDER SCADA software of ABB. The power workstations integrated are
•    §    POWERTCMÔ for Trouble Call Management
•    §    POWEROUTAGEÔ for Power Supply Outage Management, comprising functions Fault detection, Supply Restoration, Emergency Load Shedding
•    §    POWERAM/FMÔ for Automated Mapping and Facilities Management
•    §    POWERAMRÔ for Automated Meter Reading
•    P
•    DRUM - The Government of India, in collaboration with USAID, has launched a programme called “Distribution Reform and Upgradation Management” (DRUM) to create centers of excellence in 4 states in the first phase.  The states selected are Karnataka, Maharashtra, Gujarat & Delhi.  In all these States one Sub-division or Division is selected and USAID appointed consultants (GECE) would develop a detailed pr
•    APEEP - The contributions of the consultancy assignment are
•    §    Demonstrating that the technical losses in a distribution network can be reduced by more than 50% from the existing level and such projects are highly financial viable as pay back period is less than one year and cost of energy saved is less than Rs 1/
•    §    Certification and verification of loss reductions projected in the project reports, on co
•    Transmission Network Maintenance Management System (TNMMS) - The purpose of TNMMS was to build a Geographic Information System (GIS) and Asset management system of entire Transmission Network of a Utility
•    GPS Survey, GIS Mapping and Consumer Indexing - The works contemplated under this consultancy assignment are:
•    §    Carrying out field survey of the entire distribution network of 11kV and LV lines in the above mentioned areas using differential GPS equipment
•    §    Asset Coding and development maps/sketches of sub-transmission and distribution network covering 33kV S/s, 11kV feeders, distribution transformers
•    §    Consumer indexing by door-to-door surv
•    District Integrated Development Schemes (DIDS) Project of Karnataka State - The consultancy assignment contemplates survey of entire HT and LT Distribution System, preparation of Digital Maps and formulation of Short Term and Long Term Distribution System Upgradation Projects for the two districts. The important activities of the assignment are:
•    Survey of Distribution Network and Preparation of Digital Maps
•    Inventory of Distribution System Facilities and Creation of Fa

Quality Certification


•    ISO 9001

Collaboration


§    PA Consultants
§    Deloitte Touche Tohamatsu
§    Power Consultant, UK

Markets

•    Africa
•    India
•    UAE
•    UK
•    US